October 17 - Engineering and Programming Saturday Meeting
Today, the engineers have started working on assembling and implementing our intake system. Our team members have designed and 3D printed many parts to use in our intake system. We still have much to do before our intake system is fully operational and some of us will CAD some more 3D parts between meetings. The programmers tweaked the vision software to fit the camera used. It worked "spectacularly" as noted by a programmer. A flowchart was drawn up for the driver control period.
Comments
Post a Comment